Skip to content
Adcom Kitchen & Flooring
Newly framed kitchen in a rebuilt Los Angeles foothill home with fresh drywall and morning light

Fire & Water Damage Repair

Rebuilding a Kitchen After the Eaton or Palisades Fire

A kitchen rebuild after fire comes late in a long sequence: debris removal, design, permits, foundation, framing and rough-in all come first, and cabinets, counters, tile and flooring are installed only once the house is enclosed and inspected. For families who lost homes in the January 2025 Eaton and Palisades fires, the most useful thing to know about finishes is when to decide on them, so they are ready the day your builder needs them and not a moment sooner.

By the Adcom Kitchen & Flooring showroom team · Published

Where does the kitchen fit when you rebuild after a fire?

Every rebuild is different, and many families are juggling insurers, temporary housing and school changes at the same time. The general order of work, though, is predictable:

  1. Debris removal and site clearance

    After the January 2025 fires, federal agencies removed household hazardous materials and, on lots enrolled in the government program, cleared fire debris; others used private crews. Any soil work your site needs follows.

  2. Design and permits

    An architect or design-build firm prepares plans; the permitting office for your address reviews them.

  3. Foundation, framing and roof

    The house goes up and is closed in against weather.

  4. Rough plumbing, electrical and gas

    Licensed trades set the sink, range, dishwasher and lighting locations, followed by inspections.

  5. Insulation and drywall

    The rooms take their final shape, and cabinet measurements can be confirmed against real walls.

  6. Cabinets, counters, tile and floors

    Finishes go in, followed by fixtures, appliances and final inspection.

Want to see the options in person?

The Sherman Way showroom has cabinets, counters, tile and flooring on display side by side. Call before you come and say what you're working on.

Who issues rebuild permits in Altadena, Pacific Palisades and Malibu?

The fires crossed several jurisdictions, and the permit office depends on the address, not the name of the fire.

Rules, fee waivers and streamlined review for like-for-like rebuilds have changed through recovery; confirm current requirements with the office for your address.
AreaJurisdictionPermits from
AltadenaUnincorporated Los Angeles CountyLA County Public Works, Building & Safety
Pasadena and Sierra Madre addresses affected by the Eaton fireIncorporated citiesEach city’s own building division
Pacific PalisadesCity of Los AngelesLADBS
MalibuCity of MalibuMalibu’s building safety division

Exterior walls, roofs, vents and windows in fire hazard severity zones fall under the wildfire-resistant construction chapter of the California Building Code. Interior kitchen finishes are not governed by that chapter, which gives you broad freedom inside.

When should you choose and order kitchen finishes?

Deciding too late delays the builder; ordering too early leaves boxed cabinets with nowhere safe to go. A cleared lot is not a place to store finishes. This timing works for most rebuilds:

Construction stageFinish decision
DesignChoose the layout, appliance sizes and whether the kitchen will be gas or all-electric
Plan checkPick cabinet style and color, counter material, backsplash and flooring so the plans and budget reflect them
Framing completeWalk the frame with your builder to confirm window, door and plumbing locations
Drywall completeFinal field measurements; place cabinet and counter orders
House enclosed and secureDeliver cabinets, then template counters after cabinets are set
Cabinet door, quartz sample and wood-look tile laid on builder drawings for a rebuilt kitchen
Choosing finishes during plan check keeps orders in step with construction.Illustration

Which kitchen decisions get locked in early in a rebuild?

Some kitchen choices are cast in concrete, literally, months before cabinets arrive. Others can wait until drywall. Knowing which is which takes pressure off the decisions that can wait.

Decide before the foundation or framingCan wait until drywall or later
An island with a sink or cooktop, since its drain, gas or conduit may run through a slab before it is pouredCabinet door style and paint color
The range location and the path for a ducted hoodHardware, pulls and knobs
Gas, all-electric or both, and the panel size that followsBacksplash tile and pattern
Window sizes and heights on the sink and counter wallsCountertop color and edge, up to the point of templating
Appliance widths, including any panel-ready refrigerator or dishwasherLight fixtures, as long as box locations are set
Floor type and thickness where the kitchen meets other roomsFloor color and plank width within the same product type

A short session at the showroom during design, to settle the left-hand column, makes the rest of the selections a straightforward visit later in the build.

Kitchen island framed on a new slab with black drain and vent pipes rising beside it
An island sink or cooktop has to be located before the slab is poured, because its drain and conduit run through it.Illustration

What if the house is standing but smoke-damaged?

Many homes near the burn areas survived with smoke, soot and ash inside. Cabinet boxes, especially particleboard ones, can hold smoke odor, and fine ash settles inside drawers and under flooring. Before deciding what to replace, work with your insurer and qualified cleaning or environmental professionals to assess the home. Hard surfaces like tile and stone counters often clean well; soft and porous materials are more often replaced.

The fire damage rebuild page covers both cases: full rebuilds and partial replacement after smoke damage.

Gas or induction in a rebuilt kitchen: weighing the trade-offs

A rebuild is the one moment when switching cooking fuel costs little extra, which is why many families ask about it. Rules on gas lines in new construction differ between the City of Los Angeles, LA County and Malibu, and rebuild-specific exemptions have been issued since the fires, so the permit office for your address has the final word. Within those rules, the trade-offs are practical:

  • Induction heats quickly, leaves the cooktop surface cooler and puts less combustion pollution into the house. It needs a dedicated 240-volt circuit and enough panel capacity, which your electrician sizes during design, and pans must be magnetic.
  • Gas is familiar, and a burner can usually be lit with a match when the power is out. That matters in foothill and canyon areas where the electric utility may switch off power during high fire-risk wind events.
  • Ventilation matters either way. A hood ducted outdoors and sized for the cooktop is worth planning into the framing for both fuels.
  • Backup power such as a battery system or a generator inlet changes the induction outage question, and is easiest to plan while walls are open.

This is a cooking and comfort choice, not a coverage question. How a policy treats a change of fuel or appliance type is something to confirm with your insurer in writing.

Choosing finishes for a rebuilt kitchen: what the showroom sees

Families planning a rebuilt kitchen often face the decision with little energy left for it. Seeing cabinets, counters, tile and floors together, in one place, keeps the number of decisions manageable.

  • Bring photos of the old kitchen, if you have them. Some people want to recreate what they lost; others want something different. Either is easier to plan from a picture.
  • Decide on the palette in one sitting. Cabinet color, counter and floor chosen together rarely need revisiting.
  • Share the builder’s drawings. Cabinet layouts are drawn from the plans, then confirmed with field measurements once walls are up.
  • Plan the whole floor at once. Running one floor through the kitchen and living areas simplifies ordering and installation.
  • Choose installation if it helps. The cabinets, counters, tile and flooring you select can be installed on request, coordinated with your builder’s schedule.
Finished family kitchen with white oak cabinets, stone counters and wide plank floors in a rebuilt home
Finishes are installed once the house is enclosed, inspected and dry.Illustration

Rebuilding in Altadena, Malibu and the Palisades

The North Hollywood showroom is about 32 minutes (23 miles) from Altadena and about 53 minutes (37 miles) from Malibu. Pacific Palisades is part of the City of Los Angeles; the Los Angeles service area page covers it alongside other city neighborhoods. The showroom does not design homes, pull permits or do structural work; it supplies and installs the finishes once your licensed builder is ready.

Next steps for a fire rebuild kitchen

Read the fire damage rebuild page for finish options and timing, and the damage repair overview for water damage and insurance-claim replacement. Verify your builder and each trade on the CSLB license lookup, and keep your insurer’s scope close at hand when you choose materials.

Quick answers

Do I have to rebuild the same kitchen my policy describes?

Usually not, but how your insurer pays may depend on it. Many policies pay to replace with like kind and quality, and some allow you to put that amount toward a different design or upgrade at your own cost. Rules vary by policy, so ask your insurer in writing and use the California Department of Insurance wildfire resources for guidance.

Can cabinets be delivered before the house is fully enclosed?

It is better to wait. Cabinets and flooring need a closed, dry, secure building; a site without windows and doors exposes them to dust, weather and theft. Most rebuilds schedule cabinet delivery after drywall and final measurements, with counters templated once the boxes are set and leveled.

Does the wildfire building code affect kitchen finishes?

Mostly no. The California Building Code’s wildfire chapter governs exterior construction in fire hazard severity zones, such as roofing, siding, vents, decks and windows. Interior cabinets, counters, tile and flooring are not covered by it. Your builder and the permit office for Altadena, Malibu or the Palisades can confirm exterior requirements.

Can smoke odor be removed from kitchen cabinets?

Sometimes. Solid wood and plywood cabinets with intact finishes can often be professionally cleaned and sealed. Particleboard boxes and unfinished interiors absorb odor more deeply and are more often replaced. Have a cleaning or environmental professional assess the home and document findings for your insurer before you decide.

Should a rebuilt kitchen use gas or induction cooking?

It depends on the rules for your address and how you cook. Induction is fast and keeps combustion fumes out of the house, but needs a 240-volt circuit and adequate panel capacity. Gas can be lit during a power shutoff, which some canyon and foothill households value. Confirm with LA County Public Works, LADBS or Malibu what fuel options your rebuild permit allows before the framing stage.

Sources

About this guide

Written by the team at Adcom Kitchen & Flooring, a kitchen cabinet, countertop, tile and flooring showroom at 13259 Sherman Way in North Hollywood. Rules and figures from outside sources are attributed; confirm current requirements with your building department or the agency named.

More on this topic: Fire & Water Damage Repair

Talk to the showroom before you buy

Call with your measurements and photos, or stop by Sherman Way to compare cabinets, counters, tile and flooring side by side.

Adcom Kitchen & Flooring · 13259 Sherman Way, North Hollywood, CA 91605 · Get directions · Showroom hours

Call (818) 765-9955 Directions