What a complete kitchen remodel in Los Angeles includes
“Full remodel” means different things to different contractors, so it helps to write the scope down before anyone quotes it. On the finish side, which is the part the showroom supplies, a gut kitchen usually involves these pieces:
- Cabinetry for the whole room. Base, wall and tall kitchen cabinets from local or imported lines, in maple, cherry, oak, hickory, thermofoil or painted finishes.
- Countertops. Full slabs or prefabricated tops in granite, marble or quartz, templated after the boxes are set. See countertops for the material trade-offs.
- Sink. Stainless steel undermount or drop-in bowls, picked at the same time as the counter so the cutout is right.
- Backsplash. Ceramic, porcelain, mosaic or natural stone tile run from counter to wall cabinets or to the ceiling behind the range.
- Flooring. Hardwood, waterproof vinyl, laminate or porcelain tile, often carried past the kitchen into the dining or family room.
- Installation of the products you buy, when you ask for it, or delivery to your own installer or builder.
Work that is not finish material, such as moving drain lines, adding circuits, relocating a gas range, patching drywall or buying appliances, belongs to other trades and should be listed separately in any bid you sign.

Gut kitchen remodel or new cabinets and countertops only?
Not every tired kitchen needs to go back to the studs. The deciding questions are whether the layout works, whether the cabinet boxes are sound, and what is hiding behind them. A 1950s Valley ranch kitchen with original galvanized supply lines is a different job from a 2005 tract kitchen with good boxes and dated doors.
| Approach | What changes | What stays | Usually right when |
|---|---|---|---|
| Full gut remodel | Cabinets, counters, sink, backsplash, floor; often lighting and plumbing | Exterior walls, sometimes windows | Layout fails, boxes are damaged, or wiring and pipes are being updated anyway |
| Kitchen remodel with new cabinets and countertops | Cabinets, counters, sink, backsplash | Existing floor if it runs under the boxes and is in good shape | Layout works but cabinets are worn out |
| Refresh | Doors, drawer fronts, hardware, maybe counters | Cabinet boxes, floor, plumbing | Boxes are solid and only the face looks old |

If the room is tight, the small kitchen remodel page covers galley and bungalow layouts, and cabinet refacing covers the keep-the-boxes route. Our post on choosing between a kitchen refresh and a full remodel walks through the same decision with more examples.
Questions about full kitchen remodel?
Call with your measurements and photos, or stop by Sherman Way to compare cabinets, counters, tile and flooring side by side.
- Showroom at 13259 Sherman Way, North Hollywood
- 20 Google reviews
- BBB rating A+
- Cabinets, counters, tile & floors in one place
A turnkey kitchen remodel package, chosen in one visit
The advantage of a showroom that carries cabinets, counters, tile and floors under one roof is that the whole palette is decided at once, so nothing arrives that clashes with something already installed. A typical path looks like this:
Measure and photograph the existing room
Wall lengths, ceiling height, windows, doors, and where the sink, range and refrigerator sit now.
Choose the cabinet line and door
Compare framed and frameless boxes and settle the door style and color first, since it anchors every other choice.
Pull counter, tile and floor samples beside it
Set slab or prefab samples on the cabinet, lean backsplash tile behind them and lay floor planks at your feet.
Lock the layout with your builder
If plumbing or electrical is moving, the cabinet plan and the trade rough-in have to agree before ordering.
Verify measurements and order the package
Final dimensions come from the opened-up room, not the old cabinets. Ask for arrival windows for each item.
Install in sequence
Cabinets, then counter templating, then sink and backsplash, with flooring where your plan puts it.

Should flooring go in before or after the cabinets?
Both methods are common, and the right one depends on the floor. Running a floating floor such as vinyl plank or laminate under base cabinets can pin it and stop it from expanding, so many installers set those floors after the cabinets and finish against the toe kick. Tile and nail-down hardwood are often run wall to wall first, which makes later layout changes easier and leaves no seam if an island moves. Whichever order you choose, the cabinet height has to account for the finished floor so the dishwasher still slides out.
Ask the installer to put the sequence in writing, and protect any finished floor with heavy paper or board before cabinets and slabs are carried across it.

What drives the cost of a full kitchen renovation in Los Angeles?
A full kitchen costs more than the sum of its cabinets because demolition, trade work and repairs to what was hidden all land on the same invoice. The finish materials are the part you can steer most directly:
- Cabinet construction and count: plywood boxes, tall pantry and oven units, and drawer stacks raise the price; standard sizes keep it down.
- Counter material and edge: a prefab granite top costs less than a full quartz slab with a mitered edge and waterfall end.
- Backsplash coverage: a 4-inch strip, a standard 18-inch run or full-height tile behind the range are very different quantities.
- Floor area: carrying the new floor into adjacent rooms avoids an awkward transition but adds square footage.
- Surprises behind the walls: water damage, old wiring or uneven subfloor found during demolition.
- Moving things: relocating a sink, range or wall adds plumbing, gas, electrical and permit costs.
For published averages and how to read them, see our guide to kitchen remodel cost in Los Angeles.
Permits and trades on a gut remodel
In the City of Los Angeles, LADBS issues building permits, and LAMC §91.106 sets out when one is required; replacing cabinets in place is very different from rerouting plumbing or adding circuits. Homes in unincorporated communities go through LA County Building & Safety, and cities such as Burbank, Glendale and Pasadena run their own building divisions.
Homes built before 1978 may have lead paint on walls and trim. The EPA’s Renovation, Repair and Painting (RRP) rule sets lead-safe work practices for contractors disturbing painted surfaces in those houses.
Why plan a complete kitchen makeover at Adcom
- Every surface in one room. Local and imported cabinetry is displayed beside backsplash tile and countertops, with flooring on the same floor, so the full palette is decided at once.
- Slab or prefab, your call. Pre-fabricated and full-slab countertops keep a kitchen design customizable and cost-efficient at the same time.
- Material at every price level. Cabinet colors and sizes, granite, marble and quartz, and hardwood, vinyl, laminate and tile floors span a wide budget range.
- Installation on request. Take materials home for your own crew, or ask for the pieces you chose to be put in.
- Help with sourcing. According to Google reviewers, staff will match competing quotes within reason and hunt down tile that isn’t in stock.
Clients drive in from across the region: Burbank is about 14 minutes (7 miles) from the showroom, Glendale homeowners often rework 1920s and 1940s kitchens, and Santa Clarita tract homes from the 1980s and 1990s are frequent gut-remodel candidates. The Los Angeles page covers neighborhoods across the city.
Living through the project and caring for the new kitchen
Before demolition, move the refrigerator and a microwave into another room and seal doorways with plastic sheeting to keep dust out of bedrooms. Our kitchen remodel prep checklist lists the rest.
Once the room is finished, reseal natural stone on the schedule the fabricator gives you, keep standing water off wood and laminate floors, and wipe the sink base dry after any drip. Manufacturer warranty terms vary by product, so keep the paperwork for cabinets, counters and flooring together and read it before cleaning with anything harsh.
What Google reviewers say
Quoted from public Google reviews. Adcom Kitchen & Flooring has 20 Google reviews; read them all on Google.
“They have a huge selection of kitchen cabinets, tiles and flooring. But the best part is their service. Tony Jr. is beyond reasonable, honest and he went out of his way to make sure we get the products and meet our deadlines. Highly recommended!”
“Tony is the best. Great Value, and service. Tony stands behind his products. His granite installers went above and beyond and handcrafted a part of the counter top that required extra effort.”
“Tony and his guys are awesome. We purchased our flooring and installation from him, and couldn’t be happier with the results. He helped us find a style that we would love, and the installation was well done.”
Full Kitchen Remodel around Los Angeles and Ventura counties
- Full Kitchen Remodel in Los AngelesValley ranch kitchens often hide galvanized pipes behind cabinets.
- Full Kitchen Remodel in BurbankAbout 14 minutes away; 1930s bungalow galleys get gutted.
- Full Kitchen Remodel in Glendale1920s Spanish and Tudor kitchens usually need rewiring first.
- Full Kitchen Remodel in Santa ClaritaBuilder-grade 1980s tract kitchens get replaced top to bottom.
- Full Kitchen Remodel in AltadenaEaton Fire rebuilds choose every kitchen surface from scratch.
- Full Kitchen Remodel in PasadenaCraftsman gut remodels keep period doors and oak floors.
- Full Kitchen Remodel in ArcadiaTeardown rebuilds order custom cabinetry and slab stone together.
- Full Kitchen Remodel in Temple CityLarger new builds need complete kitchen packages specified early.
- Full Kitchen Remodel in La MiradaLa Mirada's 1950s-60s ranch kitchens near Biola often keep original floors, so a full remodel usually replaces floor, cabinets and counters together.
Full Kitchen Remodel: common questions
What is included in a full kitchen remodel?
Usually new cabinets, countertops, sink, backsplash and flooring, plus the demolition that clears the old room and the trade work that updates plumbing, wiring and lighting. The showroom supplies and can install the finish materials. Write the full scope down, including who handles tear-out, drywall and appliance hookups, so every bid you compare covers the same work.
Can the layout change or must appliances stay where they are?
The layout can change, but moving a sink, dishwasher or gas range means rerouting plumbing, gas or electrical lines, which needs a permit and licensed trades. In the City of Los Angeles that permit is issued by LADBS. Keeping the wet wall where it is saves the most money, so many full remodels change the cabinets and island while leaving the sink run in place.
Do you install the flooring before or after the cabinets?
It depends on the floor. Floating vinyl plank and laminate are often installed after the cabinets so the boxes don’t pin the floor and stop it moving, while tile and nail-down hardwood are often laid wall to wall first. Either way, the cabinet and dishwasher heights are planned around the finished floor thickness, and the sequence should be agreed before ordering.
How do I keep using my home during a full kitchen remodel?
Set up a temporary kitchen in a dining room or garage with the refrigerator, a microwave, a hot plate and a utility sink or bathroom for washing up. Seal the work area with plastic sheeting and keep a clear path from the front door. Scheduling cabinet delivery close to demolition shortens the weeks without a working kitchen.
Is a full remodel worth it in an older Los Angeles house?
Often, yes, because opening the walls gives a chance to replace old galvanized pipes or ungrounded wiring while the cabinets are out. In a pre-1978 home, lead-safe work practices under the EPA RRP rule apply when painted surfaces are disturbed. If the plumbing and wiring are already updated, a cabinets-and-counters swap may deliver most of the visible change for less.
Request a full kitchen remodel quote
Calling is fastest: (818) 765-9955. Prefer to write? Send the basics and the showroom will get back to you.
Related services
Helpful guides
Areas we serve
Ready to see it in person?
Bring your photos and measurements to the Sherman Way showroom, or call and talk it through first.
Adcom Kitchen & Flooring · 13259 Sherman Way, North Hollywood, CA 91605 · Get directions · Showroom hours
- Showroom at 13259 Sherman Way, North Hollywood
- 20 Google reviews
- BBB rating A+
- Cabinets, counters, tile & floors in one place

